40T-m塔式起重机总体设计(含CAD零件图装配图)
无需注册登录,支付后按照提示操作即可获取该资料.
40T-m塔式起重机总体设计(含CAD零件图装配图)(任务书,开题报告,外文翻译,周进度表,论文说明书7000字,CAD图7张)
摘要
这几年,城市建筑越来越多,塔机需求量增加,随处可见成片的塔式起重机以及塔群,可见塔式起重机对我国城市建设起着至关重要的作用
然而随着塔式起重机的普及,塔式起重机坍塌,折断等事故也频频发生,这些血的教训警示我们,要进一步塔式起重机安全设计以及安全防范工作,防止此类悲剧再次发生,这要求塔式起重机设计人员以及安装检测人员要不断努力,培养专业素质,防患于未然,提升设备的稳定性,以杜绝此类事件的发生
由于塔式起重机常常被应用于工况恶劣的工作环境中,因此对于塔机来说安全性是第一要素,在塔机设计的过程中设计者往往运用类比法,由于更注重安全性,难以兼顾经济型,同时,这种方法也有着诸多弊端,如复杂性高,经常出错,并且比较浪费时间。
本次课题我有幸选到了40T-m塔式起重机的总体设计这一课题,设定塔机臂长为47m根据,参考资料初步确定塔机的各项参数,并对其进行风力载荷,塔机整体稳定性等方面的校核计算,在这个过程中查阅了很多资料,并结合了所学的理论力学及材料力学的知识,分析塔机各部分受力情况,初步了解了塔机的设计过程
关键词:塔式起重机、风力载荷、稳定性、校核计算
ABSTRACT
Over the past few years, more and more urban buildings have been built, and the demand for tower machines has increased. Tower cranes and towers can be seen everywhere. It can be seen that tower cranes play a crucial role in the construction of cities in China.
However, with the popularity of Tower cranes, tower cranes collapse, breaks and other accidents frequently occurred, these blood lessons remind us to further the safety design of Tower cranes and safety prevention work to prevent such tragedies from happening again. This requires continuous efforts on the part of tower crane designers and installation and testing personnel to cultivate professional qualities, prevent problems before they occur, and improve the stability of the equipment so as to prevent such incidents from happening.
Since tower cranes are often used in poor working conditions, safety is the first element for tower machines. In the process of Tower machine design, designers often use analogy, because they pay more attention to safety, it is difficult to take into account the economy. Type, at the same time, This method also has many disadvantages, such as high complexity, frequent mistakes, and more wasted time.
On this topic, I have the privilege of selecting the overall design of the 40-T-m tower crane. The length of the tower is set to 47M. According to the reference materials, the parameters of the tower machine are initially determined, and the wind load and the overall stability of the tower machine are checked. In this process, a lot of data were consulted, and combined with the knowledge of theoretical mechanics and material mechanics, the force of each part of the tower machine was analyzed, and the design process of the tower machine was preliminarily understood.
Key words: tower crane, wind load, stability, check calculation
目录
摘要 2
ABSTRACT 3
第一章 引言 4
第二章 40T-m塔式起重机总体设计 5
2.1 主要技术性能参数 5
2.2总体设计原则 5
2.3 平衡重的计算 7
2.4起重特性计算 8
2.5 塔机风载荷的计算 8
2.5.1工作状态工况 8
第三章 塔式起重机抗倾翻稳定性计算 13
3.1 抗倾翻稳定性简述 13
3.2塔机倾翻稳定性校核的基本原则 14
3.3验算工况1 16
3.4验算工况Ⅱ 16
3.5验算工况Ⅲ 17
3.6塔机固定式底架稳定性计算 18
第四章 塔式起重机的安装和拆卸 20
4.1 塔式起重机安装准备 20
4.2塔式起重机安装 21
4.3塔机安装时的部分工况计算 21
结语 22
参考文献 23
致谢 24